You are on PERI's international website. Click here to switch to PERI USA. Click here to view all PERI websites.

Golden Ears Bridge, Canada

Projekt adatok

Helyszín: Vancouver, Kanada

Cable-stayed bridge over the Fraser River

Length: 976 m
Longest span: 244 m
Pylon heights: 86 m
Start of works: 2006
Opening for traffic: 2009

Projekt követelmények

Four H-shaped pylons with continually changing cross sections and extremely high wind loads.

Ügyfél

Bilfinger Berger Inc., Vancouver

Ügyfél előnyök

Construction time reduced by regular weekly cycle and climbing not dependent on cranes.

Golden Ears Bridge - Michael Hug, Polier
Michael Hug
Site Foreman

I have already been working with PERI systems for many years and I am convinced that the ACS Climbing System and the VARIO Wall Formwork are the optimum solution. ACS enabled us to reduce the build time. In my opinion PERI offers the best formwork systems in terms of technology.

PERI megoldások

  • climbing formwork solution for pylons without crane support with concreting cycle heights of 4 m
  • climbing platforms positioned lengthwise with mobile formwork elements on rollers for the front ends
  • VARIOKIT system consoles for concreting the carriageway slab with working platforms of a total length of 600 m